Glossary · EI-WEB-010
Words the industry uses loosely, made exact.
16 terms, each with where it is shown on this site and, where a standard defines it, which one.
- BCF (BIM Collaboration Format)The buildingSMART format for exchanging issues about a model, each with its viewpoint, between BIM tools.
- Boundary survey reportThe Land and Survey Department’s report for a plot: its boundary points as coordinates, its sides, any arc sides and its area.
- CDE (common data environment)The agreed source of information for a project, where every container moves through four states: work in progress, shared, published and archive.
- ClashA place where two elements of a model occupy the same space (a hard clash) or come closer than a set clearance (a clearance clash).
- Coordinated modelA model in which the disciplines have been checked against each other, and every clash is resolved or listed as open with its reason.
- EIR (exchange information requirements)The information requirements of an appointment: what the appointed party must deliver, when, and to what standard.
- Federated modelA model assembled from separate discipline models, such as architecture, structure and MEP, each kept by its author and viewed together.
- IFC (Industry Foundation Classes)The open schema for exchanging building information between software. IFC 4.3 is published as ISO 16739-1:2024.
- Information containerA named set of information, such as a model, a drawing or a schedule, stored, versioned and given a status as one unit.
- ISO 19650The international series on managing information over the life of a built asset using building information modelling, in six parts.
- LOD (level of development)How far a model element can be relied on: from a symbol (100) to measurable, as designed (300), to an as-built record (500).
- LOD 350An element modelled as designed, whose size, shape, location and orientation, and its interfaces with adjacent elements, can be measured.
- LOIN (level of information need)The geometry, information and documentation a given purpose needs, set out in ISO 7817-1:2024.
- SagittaThe height of an arc above its chord, at the middle. With the chord it gives the radius: R = (c²/4 + s²) / 2s.
- SetbackThe distance from a plot’s boundary within which building is not permitted, set by the municipality’s zoning for the plot.
- Status codeA code on a container that says what it may be used for, such as S1 suitable for coordination or S2 suitable for information.